Heating System Modernization: Retrofitting Existing Plant with Raymer Split Heat Pump

Project Type

Boiler room

Date

September 2026

City

Bucha

Scope of Work:
• Integration of a Raymer split-type heat pump (R32 refrigerant, Panasonic compressor) into an existing heating system with a backup electric boiler
• Installation of the indoor hydrobox and connection to the primary heating circuit
• Exterior unit mounting on a metal support frame with anti-vibration isolation pads
• Refrigerant piping installation between indoor and outdoor units, including deep vacuum evacuation
• Installation of a floor-standing buffer tank (hydraulic separator) equipped with a safety group (pressure gauge, automatic air vent)
• Hydronic piping assembly using closed-cell rubber insulation and premium shut-off valves
• System commissioning, leak testing, and Wi-Fi smart control module configuration